Basic Info.
Model NO.
OL35-303E
Power Type
AC Source
Timing Function
With Timing Function
Water Shortage Power-off Protection
With Water Shortage Power-off Protection
Transport Package
One PC Into a Carton with Foam Inside
Specification
35L/day
Trademark
Eurgeen
Origin
China
Product Description
DEHUMIDIFIER 03 SERIES
Technical Parameters | ||
Power Supply | 220V/50Hz | |
Power Consumption | 570W | |
Rated Current | 2.8A | |
Dehumidify Capacity(30ºC80%RH) | 30L/Day; 35L/Day | |
Noise | ≤60dB(A) | |
Air Circulation | 450m3/hr | |
Refrigerant | R410a/300g | |
Water tank capacity | 5.5L | |
Working Temp. | 5ºC-35ºC | |
Recommend Room Size | 30~40m²(height=2.6m) | |
Dimension | W430*D515*H825mm | |
Package Size | W505*D565*H730mm | |
Net Weight | 33kg | |
Gross Weight | 36.5kg | |
Loading Quantity(20GP/40GP/40HQ) | 132/276/276 | |
MOQ | 132 sets |
Functions and Features | ||
1, Rotary Compressor | 2, Humidity Setting | 3, Three-Minute Automatic Delay Protection of the Compressor |
4, Automatic Defrost | 5, Color is optional | 6, Humidity and Trouble Display |
7, Big water tank | 8. Timer is optional | 9, Water pump is optional |
Company Introduction:
FAQ:
Q: Are you a trading company or manufacture?
A: As one of the oldest manufactures of dehumidifiers and humidifiers,we are now taking the leading position of air treatment industry in mainland China. We have more than 500 employees with more than 30 engineers and 6 production lines.
Q: Do you accept OEM?
A: Yes, we can accept OEM, and we have the professional designer to help you design your logo.
Q: Can I buy a sample for testing
A: Yes, we can supply you with a sample. For most of the models,we have them in stock. We can supply you sample within 7 days after we get your payment.
Q: Can I visit your factory?
A: We warmly welcome you come to visit us at Hangzhou city, Zhejiang province. You can take the airplane to Shanghai, then take the fast train for 50 minute to Hangzhou railway station. We can pick you up at the railway station. If you fly to Hangzhou directly, we can pick you up at the airport.
Q: What is the delivery time for bulk machine?
A: 45 days for first delivery,second is 30days