500m3/H Biogas Pre-Treatment System Desulfurization Dehumidifier Scrubber Tower System

Get high-quality 500m3/H Biogas Pre-Treatment System Desulfurization Dehumidifier Scrubber Tower System from our factory. Efficiently remove sulfur and moisture from biogas.
Request a Quote

PRODUCTS DETAILS

Basic Info.

Model NO.
ALBS500
Tank Material
Stainless Steel 304 or Carbon Steel
Blower
Anti-Explosion, Variable Frequency Motor
Connection Pipes
PVC or Stainless Steel Pipes
Auxiliary
Pressure Guage, H2s Sensor, Ss Flange,etc
Transport Package
LCL or FCL
Specification
Complete System
Trademark
ALONG BIOGAS
Origin
China
HS Code
8486909000
Production Capacity
100 Sets/Year

Product Description

500m3/H Biogas Pre-Treatment System Desulfurization Dehumidifier Scrubber Tower System 500m3/H Biogas Pre-Treatment System Desulfurization Dehumidifier Scrubber Tower System 500m3/H Biogas Pre-Treatment System Desulfurization Dehumidifier Scrubber Tower System 500m3/H Biogas Pre-Treatment System Desulfurization Dehumidifier Scrubber Tower System
Material option: Cast iron, Stainless steel 304


Our GasCle system is for the pre-treatment of raw biogas from anaerobic reactor, suitable for biogas flow 20 ~ 500 Nm³/hr. The raw biogas from digester always contains saturated water vapor, physical impurities and hydrogen sulfide. These substances should be removed before the utilization of biogas, to avoid damage to generator, burner of boiler and torch or other equipment.
500m3/H Biogas Pre-Treatment System Desulfurization Dehumidifier Scrubber Tower System500m3/H Biogas Pre-Treatment System Desulfurization Dehumidifier Scrubber Tower System500m3/H Biogas Pre-Treatment System Desulfurization Dehumidifier Scrubber Tower System500m3/H Biogas Pre-Treatment System Desulfurization Dehumidifier Scrubber Tower System500m3/H Biogas Pre-Treatment System Desulfurization Dehumidifier Scrubber Tower System
The GasCle system is skid mounted in combination of multiple functional units, or individually installed at project site.

GasCle system has the following modules:
1.  Primary filter (optional)
For preliminary removal of physical impurities and saturated water vapor;
2.  Desulphurization tank.(the quantity and size are dpended on the request)
For reducing the hydrogen sulfide content in biogas, to meet the requirements of follow-up equipment;
3.  Secondary filter.
For Precise removal of physical impurities in the biogas and moisture;
4.  Biogas blower
Increasing biogas pressure for transportation and meed the requirement of follow-up equipment for gas intake pressure;
5.  Electrical control system
Equipped with VFD(variable frequency drive) and LCD touch screen.
- Pressure gauge and H2S analyzer(Optional).
-  Pipes, valves and base frame.


GasCle system has the following functions:
1.  Desulfurization
Hydrogen sulfide can be reduced to 50ppm or less;
2.  Dehydration
Removal of saturated water vapor;
3.  Impurity removal.
Removal of physical impurities and volatile matter of desulphurizer agent;
4.  Pressure increasing
Increment could reach 39.8 kPa or even higher;
5. Pressure stabilization
Stabilizing gas outlet pressure at a fixed value to meet the gas intake pressure requirement of the follow-up equipment;
6.  Measurement of Pressure and hydrogen sulfide content (optional);
7.  Digital display.
Pressure setpoint, gas outlet pressure, motor frequency, motor speed, motor current, output torque, bus voltage, output voltage, power consumption and system operation time would be indicated on the LCD display.


500m3/H Biogas Pre-Treatment System Desulfurization Dehumidifier Scrubber Tower System 500m3/H Biogas Pre-Treatment System Desulfurization Dehumidifier Scrubber Tower System 500m3/H Biogas Pre-Treatment System Desulfurization Dehumidifier Scrubber Tower System










  

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours